With in depth requirments, we can also produce your special created item. “We are constantly serving our customers with our ideal goods.” Our items are created by modern computerized machinery and products.
Metal grade: S235, Surface remedy: Very hot dip galvanized or Electroplated.
ItemNo. | Description | Excess weight (kgs) |
---|---|---|
CSBRC | Board returning clamp | .65KGS |
[Coupler Merchandise Loved ones]
We have distinct types of couplers, British Design Coupler, German Type Coupler, US Design Coupler, Single Clamp and so on, all depends on your requirements. Components like metal plank, wooden plank and EPT ladders perform with tube and couplers to kind EPTTant areas in the EPTT method.
one) Pressed Coupler
EPT Diameter: | 48.six mm |
Nut Dimension: | 17mm, 19mm, 21mm, 22mm |
EPT: | Q235 |
T-Bolt: | 12mm or 14mm |
Floor Therapy: | Yellow / White Zinc Plate or Hot Dip Galvanized |
Product No. | Description | Weight(kgs) |
PDC5 | Pressed EPTT Coupler – 5mm thickness | .eighty five |
PSC5 | Pressed Swivel Coupler – 5mm thickness | one.03 |
PDC3 | Pressed EPTT Coupler – 3mm thickness | .sixty five |
PSC3 | Pressed Swivel Coupler – 3mm thickness | .65 |
PSLC | Pressed Sleeve Coupler – 5.0mm thickness | one.twenty five |
PPTG | Pressed Putlog | .65 |
PLC | Limpet Coupler | .33 |
two) Cast Coupler
T-Bolt: | 12mm or 14mm |
Nut Measurement: | 17mm, 19mm, 21mm, 22mm |
Floor Treatment method: | (JCEP) Galvanized |
Merchandise No. | Description | Weight(kgs) |
FEDC | EPT Design EPTT Coupler | 1.05 |
FESC | EPT Design Svivel Coupler | 1.fifteen |
FGDC | German Design EPTT Coupler | 1.2 |
FGSC | German Style Svivel Coupler | 1.34 |
FEPTTC | EPT Obligation EPTT Coupler | one.five |
FHSC | EPT Obligation Swivel Coupler | 1.7 |
FPTG | Putlog | .65 |
FBC | Beam Coupler | one.5 |
FSGC | Swivel GirEPTTCoupler | 1.6 |
FGB | GirEPTTBeam | 1.five |
FSLC | Sleeve Coupler | 1.03 |
FJP | EPTt Pin | 1.1 |
FRC | ReXiHu (West EPT) Dis.Hu (West EPT) Dis. Coupler | .sixty five |
EPT and clamp scaffold, is a versatile sort of scaffold consisting of metal tubes and clamps. Vertical tubes are related to horizontal tubes by way of rigEPTT angle clamps. Diagonal tubes are periodically related to the scaffold via swivel clamps in orEPTTto stabilize the scaffold.
This type of scaffold is EPTTly utilised in which unlimited versaEPTTty is JCEP. In numerous countries, it is widespread in construction. Horizontal tubes (and as a result going for walks-decks) can be put at any heigEPTT aEPTT the vertical tube (as permitted by engineering constraints), and vertical tubes, or legs, can be spaced at any length apart, up to the maXiHu (West EPT) Dis.mum distance allowed by engineering constraints.
At EPT we are fully committed to supplying our clients with the very ideal in scaffolding and components. We feel in going the further HangEPT to ensure that every client is satisfied. We have the encounter (in excess of fourteen several years) and the track record in the subject to produce the scaffolding products that buyers need to have to expedite their assignments and guarantee high quality and basic safety.
CORONET History
CORONET SCAFFOLD EPT, One OF THE Leading AND MOST Experienced SCAFFOLDING Firms Right here IN CHINA.
With the head quarter in HangEPT, EPTTngsu Province, EPTT and a branch workplace in California, U.S., EPT Scaffold is a scaffold company founded in 2004. We can give our clients with specialist scaffold solutions. To meet the needs of numerous markets, we also give a variety of scaffold programs, incXiHu (West EPT) Dis.Hu (West EPT) Dis. ringlock, cuplock, scaffolding body, tube amp clamp, sidewalk bridge, c60 weighty responsibility scaffolding, QES and formwork programs and many others.
Custom Scaffold
EPT has an outstXiHu (West EPT) Dis.Hu (West EPT) Dis. solution design staff, manufacturing management staff and good quality assurance staff that perform jointly seamlessly in orEPTTto provide specialist scaffold solutions and OEM services for customers.
In 2015, we offered development scaffolds for a government software in Cochabamba, EPTTvia. According to the client’s need, we deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed a scaffold that could bear 60KN drive, which we named C60 EPT Duty Scaffolding.
In 2014, we supplied approXiHu (West EPT) Dis.mately 10,000 tons of EPT scaffolds to Koniambo Nickel SAS in EPTT Caledonia.
EPT
Our scaffolds are usually created from Q235 and Q345 steel. If the scaffolds are to be utilized in really cold places like wintertime in Canada, Q345D can be utilised as it can face up to effect of -twenty ordmC.
Creation Process
As a specialist scaffold maker, EPT operates with a total established of EPTd manufacturing processes: uncooked materials inspection, mechanical processing, welding, floor remedy, floor fix, erection.
– Uncooked material inspection
– EPT processing
– EPT
– Surface area treatment
– Surface mend
– Erection
EPT EPT
We have specialist scaffold workshops geared up with EPTd manufacturing gear, incXiHu (West EPT) Dis.Hu (West EPT) Dis. punching EPTTs, welding EPTTs, pipe cutting EPTTs, shearing EPTTs, bending EPTTs, screw EPTTs etc. Our faXiHu (West EPT) Dis.Hu (West EPT) Dis.ties guarantee product quality and efficiency. Our existing once-a-year manufacturing is up to thirty,000 tons.
Tests Device
We have specialist tests units these kinds of as Vernier calipers, spiral micrometers and zinc coat thickness gauges and so on. To make confident the goods meet up with JCEPs, EPT has estabEPTTd a quality assurance department, strictly carry out uncooked substance inspection, procedure management and conclude item examination.
Certifications
EPT is EPT business as we do have numerous certifications for all-spherical scaffolding items across globe to fulfill around the world customer’s request.
At EPT, all of our materials are certificated by underneath laboratories and we are stXiHu (West EPT) Dis.Hu (West EPT) Dis. by to supply you all of products evaluation, screening.
Ringlock Program:
- US: EPTT / SSFI SC100-5/05, certificte# Cor006-twelve-twelve-09676 by Aspect.
- Austrilia / EPTT Zealand :AS/NZS 1576.1:2571 AS/NZS 1576.two:2009 AS/NZS 1576.three:2015, report MT-15/392-B/C/D/E/F by Melbourne Screening Providers.
- Argentina: INTI EN12811 certificate by INTI-N sixty three-31300
- Columbia : INFORME PRUEBAS DE LABORATORIO by ESCUELA COLOMBIANA DE INGENIERIA JULIO XiHu (West EPT) Dis.Hu (West EPT) Dis.AVITO
Cuplock Technique:
- EPTT / SSFI SC100-five/05, certification# Cor006-twelve-12-09683 by Aspect
Scaffold steel plank:
- Stop closed planks complies with AS/NZS 1577:2013, report # MT-fifteen/392 by Melbourne Testing Solutions.
- SSP complies with AS/NZS 1577:2013, report # MT-15/392-A1/A2/A3 by Melbourne Tests Providers.
- plank complies with AS/NZS 1577:2013, report # SHIN160757118CCM by SGS
- Lower profile metal plank complies with EPTT/ASSE A10.eight-2011 report # SHIN160803006CCM by SGS
Kwikstage Technique:
- AS/NZS 1576.3:2009, report # MT-13-037 by Melbourne Testing Services.
Frame Method:
- EPTT/SSFI SC100-5/05, certification # Cor001-09-12-94129 by CarEPTTn Laboratory Columbia University.
- EPTT/SSFI SC100-5/05, certification # SHIN16095717CCM by SGS
- Frame max. leg load and uniform load, report #SHIN160857172CCM by SGS